What are the necessary purification equipment for dust-free workshops

Mar 20,2021

The dust-free workshop needs to be necessary. The dust-free purification workshop should install the air inlet system and the return air system of the dust-free purification workshop. People and goods entering the dust-free purification workshop must pass through the air shower, cargo shower, transfer window and other purification equipment.

1. The air inlet system should be installed in the dust-free purification workshop. Including fresh air filter box, central purification air-conditioning (central purification air-conditioning should be divided into three filtration stages: initial efficiency, medium efficiency and high efficiency), and the end is equipped with high efficiency air outlet. If necessary, install a purification booster box.

2. The return air system of the dust-free purification workshop. Including return air vent, primary effectfilter, middle effect return air box.
3. Enter the buffer zone before the dust-free purification workshop. Electronic interlocks are installed in the buffer zone, and clean lockers and air cleaners are installed in the changing areas.
4. People and goods entering the dust-free purification workshop must pass through the air shower room,cargo shower room, and transfer window.

5. In the place where the dust-free purification workshop needs to reach the level of 10-1000, it is necessary to install a vertical flow table, a laminar flow hood, a clean shed, a self-cleaner, a dust particle counter, etc.

Steps and requirements for installing clean room purification equipment:


1. The first step is to select suitable equipment according to the product requirements and the number of personnel to be produced in the purification workshop. Pay attention to the degree of sealing when all kinds of purification equipment are connected to the enclosure structure of the clean room.
2. The installation process of the fan filter unit and air purification equipment in the purification equipment should meet the following requirements:
1). The fan filter unit or air purification equipment should be installed in a clean site, and remember to check the appearance, there should be no deformation, rust, damage, etc.;
2). If it is a high-efficiency air filter, a leak test should be carried out before installation, and it can be installed only after it is qualified;
3). Be careful not to make mistakes in the installation direction, and pay attention to whether it is easy to overhaul when installing;
4).After the installation of the fan filter unit is completed, the overall level should be maintained, and the connection with the ceiling should be good;
5). When the system is under trial operation, a temporary medium-efficiency air filter must be installed at the air inlet.

3. If it is an air lock room with a fan, the air shower room and the ground should be provided with corresponding vibration isolation pads, so as to be flat and stable, and to cooperate properly with the clean room enclosure structure.




4. The installation of the transfer window must meet the relevant requirements of the design drawings and product instructions, the installation must be firm, vertical, and the connection must be sealed.

5. If it is a clean laminar flow hood installation, the following requirements should be met:

1). An independent boom should be provided, and fixed measures to prevent shaking should be added;
2). When the laminar flow hood is installed on the suspended ceiling, pay attention to the sealing measures between the surrounding and the ceiling.
 