When people begin planning a cleanroom, the first question that usually comes to mind is: “Where do I even start?”
This is exactly why a well-structured cleanroom checklist is so valuable—it breaks a large, complex project into a clear and understandable roadmap. At Wonclean, after supporting many clients with cleanroom design and engineering, our conclusion is simple: the clearer the checklist, the smoother the project.
Unlike ordinary rooms, cleanrooms come with a lot of rules—particle control, airflow organization, pressure gradients, filtration efficiency… all tightly interconnected like gears in a precision machine.
A good checklist helps you grasp the entire framework before diving into detailed design.
But the question is: What exactly should a checklist include? What makes it “complete”?
Let’s break it down from the most fundamental elements.
Every successful cleanroom project begins with clear requirements. These include the cleanroom’s purpose, product characteristics, and applicable regulatory standards. Whether you’re following cleanroom standards like ISO 14644 or compliance frameworks such as GMP/FDA, the foundation must be set first.
Key requirements include:
This serves as the project’s steering wheel—without it, every decision becomes guesswork.

A good layout leads to a good cleanroom; a poor layout can never be fixed later.
Your checklist should verify:
If people and materials move inefficiently, even the most powerful filtration system cannot save the cleanroom’s performance.
Cleanrooms must be easy to clean, corrosion-resistant, and free of dirt-trapping points.
Checklist essentials:
Materials may look simple—but they determine long-term durability and cleanliness.
This is where most people focus—the air system.
But a cleanroom HVAC isn’t “just an air conditioner.” It is the engine of air quality.
Checklist should include:
For pharmaceutical facilities, such as pharmacy clean room design, pressure gradients and contamination control become regulatory priorities.
No cleanroom operates without a complete support infrastructure. Checklist should review:
Each must avoid introducing vibration, contamination, or airflow disturbance.
A cleanroom stays clean not because of equipment, but because of behavior.
Checklist includes:
Human behavior always remains the top contamination source.
Before going operational, the cleanroom must pass a full validation process:
A strong checklist ensures every task is ready before validation begins.
Related:Understanding Cleanroom Monitoring System: Importance and Core Applications
A truly effective cleanroom checklist is more than a list—it’s a tool that helps you understand how a cleanroom actually works. It guides owners to clarify objectives, gives designers a reliable reference, simplifies maintenance, and strengthens regulatory confidence. Whether you’re building a new cleanroom or optimizing an existing one, a structured and logical checklist makes the entire process more efficient and controlled.
At Wonclean, we believe cleanroom engineering doesn’t need to be complicated. With the right approach, it becomes an exciting and manageable project. If you’re planning or evaluating a cleanroom system, feel free to reach out—we’re always happy to share real-world expertise.
An inspection checklist outlines all points that must be reviewed during a facility assessment, including structural conditions, HVAC performance, equipment status, and regulatory compliance. It ensures nothing is overlooked and provides a standardized method for documenting inspection outcomes.
Cleanroom validation follows a structured process including DQ, IQ, OQ, and PQ. Key steps involve HEPA filter integrity testing, airflow visualization, air change rate verification, particle count testing, and environmental monitoring setup. Validation confirms that the cleanroom performs according to its design and regulatory standards.
Essential steps include defining inspection criteria, performing on-site assessments, documenting findings, verifying compliance with standards (such as ISO 14644 or GMP), and implementing corrective actions. These steps ensure a complete and reliable inspection process from start to finish.
Yes, the URS can be updated during a project, but only through a formal change-control process. Any modification should evaluate the impact on compliance, cost, and project schedule. Proper documentation ensures the design remains aligned with regulatory expectations.
Choose flooring based on durability, chemical resistance, cleanability, and electrostatic requirements. Welded vinyl, epoxy, and ESD flooring are the most common options. The best choice depends on the cleanroom classification and the types of cleaning agents used.
Use positive pressure when you need to protect the product from outside contaminants. Choose negative pressure when the goal is to contain hazardous materials and protect personnel and the environment. The correct pressure strategy depends on your process risk profile.
Windows are not mandatory, but they are useful for supervision, visibility, and safety. If installed, they must be flush-mounted, sealed, and non-particle generating to maintain proper cleanliness and airflow performance.
ACH is calculated using the formula: ACH = (Airflow in CFM × 60) ÷ Room Volume. This value ensures the cleanroom meets ISO or GMP airflow requirements. Regular verification is essential to maintain cleanroom performance.